SAH and 1 Guest are viewing this topic.
More progress on the fertilizer plant this week, got the road done and painted, grass down and part of the mainline ballasted, the structures are in place and the dirt lot has a first pass (gotta get the grout that splashed up on the building as a powder off too). I’ll likely be adding more grout to the lot to smooth out some of the bumps, weather the building, and I still need a couple more trees around the plant. I’ve also got to figure out how I’m gonna put the scenery between the track and back of the structure in.
Been working on the N scale PRR Juniata Division T-TRAK layout
Dave, I like the way you have used trees to minimize the intrusiveness of the "slot" between the module backs, instead of relying on a wall of skyboards.
Asking as I don't think I quite grok the T-Track approach: with a setup like this, is there any particular operating plan that you have in mind? Or is it mostly a matter of 'build stuff and then jfrtm'? Do you have any sort of master plan in mind?Pretty impressive work, btw. Ed
Dave are you going to RPM next weekend?
The one in Greeley? Yes. I’ll be there Saturday only, but with the whole layout. I’ve never, ever shown any layout that wasn’t 100% scenicked before so this’ll be a new experience for me.I’d originally considered bringing the Colorado Midland instead but this will be so much easier to move.