M and K Fan and 1 Guest are viewing this topic.
Mike: The prototype has problems with long/short pairings. One BN Special Instruction from years ago, for a mountain division, said nothing under 50 feet long should be coupled to anything over 80 feet long.
WOW, I must be old.“Back in the day”, 15” courses were considered BROAD! Now we’re asking if they’re too TIGHT?? Jim
"Back in the day", when most locos and rolling stock were equipped with truck-mounted couplers, Atlas curved track with a 9-3/4" radius was common.MiniTrix had/has some curved track with a radius of about 7-1/2".
Back in the 70s, my friend had a small layout with those (7 1/2”?) curves, and would run his passenger train (Minitrix F-unit + 4 or 5 of the old Model Power streamlined cars) on that layout. Even to my 10-year old eyes, they looked toylike. And I loved it!!9 3/4” was common and considered adequate, but 11” was viewed as more realistic. 15” was considered “broad.” Even though the 80s and early 90s.Take a look at track plans from this era and you’ll see.